Logan City Council
Logan
2023
Design and Construct
Outdoor Splashpad development
After completing the upgrade to the 50-metre Jodie Henry Pool late last year, Box & Co were back at Logan North Aquatic Centre adding a new splashpad at the facility.
The new water play area complements the pool upgrade and just in time for school holidays.
Box & Co worked with Modus Australia on an upgrade to the changerooms, including the addition of a “changing places” facility which caters to the needs of people with a disability and wheelchair users.
![](https://boxandco.com.au/wp-content/uploads/2023/11/Splashpad-1-scaled.jpg)
![](https://boxandco.com.au/wp-content/uploads/2023/12/20231201_100502-scaled.jpg)
![](https://boxandco.com.au/wp-content/uploads/2023/12/20231201_100400-scaled.jpg)
![](https://boxandco.com.au/wp-content/uploads/2023/12/20231201_095851-scaled.jpg)
![](https://boxandco.com.au/wp-content/uploads/2023/12/20231201_095200-scaled.jpg)
![](https://boxandco.com.au/wp-content/uploads/2023/12/20231201_095045-1-scaled.jpg)
![](https://boxandco.com.au/wp-content/uploads/2024/07/L1080424-scaled.jpg)
![](https://boxandco.com.au/wp-content/uploads/2024/07/L1080281.jpg)